Date
1986
Document Type
Thesis
Degree
Master of Science
Department
Manufacturing and Systems Engineering
First Adviser
Wilson, George R.
Recommended Citation
Titus, Richard Jr., "Group technology based flow line scheduling to minimize maximum tardiness /" (1986). Theses and Dissertations. 4657.
https://preserve.lehigh.edu/etd/4657