Date

1973

Document Type

Thesis

Degree

Master of Science

Department

Industrial Engineering

First Adviser

Gould, A. F.

Abstract

This study considers the effect of priority dispatching in a labor and machine limited production system. A simulation model of an actual shop is developed using GASP II. The shop is characterized as a flow shop with cycling in which lots are subject to stochastic yields and reworks. Five labor sections, each operating on three shifts, exist in the shop.

Share

COinS