Date

1972

Document Type

Thesis

Degree

Master of Science

Department

Electrical Engineering

First Adviser

Redmon, John K.

Abstract

This paper presents a method of allocating the reserve capacity of an interconnection among the member companies. The proposed method utilizes an interconnection minus one company concept and a sophisticated reliability program to determine both peak and non-peak season requirements.

Share

COinS