Date

1971

Document Type

Thesis

Degree

Master of Science

Department

Industrial Engineering

First Adviser

Whitehouse, Gary E.

Abstract

Three different computational procedures for obtaining the optimum or sub-optimum loading assignment for multiproduct, multistage, multiperiod production loading model with fixed set up time are developed, formulated and evaluated. A mixed integer programming problem is formulated with the integer variables taking on Boolean values.

Share

COinS