Date

1967

Document Type

Thesis

Degree

Master of Science

Department

Industrial Engineering

First Adviser

John M. Carroll

Abstract

While the process times of stages in a production line will vary from stage to stage about some distibution mean, delay time in the line can be minimized by decoupling the stages. A functional relationship is presented for determining the optimum buffer capacity for a known output rate.

Share

COinS