Date

1965

Document Type

Thesis

Degree

Master of Science

Department

Industrial Engineering

First Adviser

Wallace J. Richardson

Abstract

This paper proposes a procedure for determining, through simulation, the multiple of sigma that should be used to maintain the current control of a process. This is done by minimizing the cost of the operation of the control chart program and any income loss which may accure from the interaction of the causal variables.

Share

COinS