About this Paged Content
"The following pages comprise chiefly the annual report on the progress of the East River suspension bridge, from 1869 to 1872."- Pref. Plates by Averell & Peckett, lithographers. Printed wrappers. Bound with other pamphlets. Binder's title: Bridges, etc.
Full Title
Pneumatic tower foundations of the East River suspension bridge. / W.A.Roebling.
Member of
Contributor(s)
relators:pbl: New York : Averell & Peckett, Printers.
Publisher
New York : Averell & Peckett, Printers.
Identifier
digital-bridges_1406
Extent
92 p. : ill. ; 23 cm.
Subject (LCSH)
Record Origin
Converted from Dublin Core to MODS during migration from CONTENTdm to Islandora
Roebling, . W. A. . 1837- 1926. (n.d.). Pneumatic tower foundations of the East River suspension bridge. / W.A.Roebling. (1–). https://preserve.lehigh.edu/digital-special-collections/digital-bridges/pneumatic-tower-foundations-east-river-suspension
Roebling, Washington Augustus 1837-1926. n.d. “Pneumatic Tower Foundations of the East River Suspension Bridge. W.A.Roebling”. https://preserve.lehigh.edu/digital-special-collections/digital-bridges/pneumatic-tower-foundations-east-river-suspension.
Roebling, Washington Augustus 1837-1926. Pneumatic Tower Foundations of the East River Suspension Bridge. W.A.Roebling. https://preserve.lehigh.edu/digital-special-collections/digital-bridges/pneumatic-tower-foundations-east-river-suspension.